Hydrostatic Testing

Before a new pipeline carries anything, it has to prove it can hold pressure. Hydrostatic testing fills the line with water, raises the pressure well above operating pressure, and holds it to confirm there are no leaks or flaws in the pipe or the welds. It is one of the last steps before a line goes into service, and it is not a place to cut corners.

Request a Bid

In scope

What this covers

  • Fill, pressurization, and hold per spec
  • Verification of pipe and weld integrity
  • Test water management and documentation
  • Coordination with commissioning and tie-in

Where it fits in the job

Testing comes after the line is welded, coated, lowered in, and backfilled, and before it is put to work. It is the proof step that ties off the construction phase, and it is part of how we hand a client a line they can trust.